Enel Green Power has started commercial pertains of the 102-megawatt Sureste I-Phase II wind farm located in the state of Oaxaca, Mexico.
The wind farm, which consists of 34 turbines of 3MW each, has been grid-connected and enjoys a 20-year power-purchase agreement. Enel Green Power was awarded the right to build the plant through a tender.
The US$160 million project was financed by US$100 million loan from BBVA Bancomer Group. Enel Green Power’s installed wind capacity in Mexico now totals 346MW.