Pingdu Begins Operation. EfW: Annual 70,000 MW/h From 600 Tonnes Of Daily Waste
China Everbright has announced that the Group’s Pingdu Waste-to-energy Project Phase I in Shandong Province has completed construction and commenced operation. It commenced construction in December 2015 and passed the “72 +24” hours trial run on 4 January 2017. The project has a designed daily household waste processing capacity of 600 tonnes and is expected to generate approximately 70,000,000 kWh of green electricity annually. Gas emissions fully comply with the Euro 2010 Standard.
Pingdu Begins Operation. EfW: Annual 70,000 MW/h From 600 Tonnes Of Daily Waste Read More »